All equipment for the project was necessarily shipped from
the Lower 48, most after being pre-assembled, configured and
tested in our Flagstaff, AZ offices.
|
|

The Building and Radios arrive by truck the day before
installation is to begin.
Off loading of these 11,000 lb crates is made short work
with the assistance provided by MSgt. James Bolinger, USAF,
at the wheel of the 10,000 lb Forklift.
'Thunder Dome', Eielson
AFB, Alaska
|
|

Test Equipment, tools and climbing gear were carried up by
John Lindsey, a few stops along the Cassier Highway in
British Columbia were well deserved.
Two members of the installation team used this 32' Trailer
and mobile shop to facilitate the quick and efficient
on-site management and installations of the radio systems.
Meziatin Junction, BC
|